Project details
Project location:
Fresno, California
Project Type:
N/A
year completed
2018
DESCRIPTION:
This new water treatment facility treats 80MGD of drinking water for the City of Fresno. New England Sheet Metal and Mechanical Co. (NESM) installed all above grade steel and stainless steel piping, ranging from 1” to 72” diameter for the project. This project consisted of a flow control vault to regulate the incoming surface water coming from the Kings River through two 40” plunger valves, a pretreatment structure to separate out the solids, an Ozone structure for disinfection, an activated carbon filtration structure, an underground 8MG treated water reservoir, and a final treated water pump station to distribute the treated water throughout the City.