Project details
Project location:
Madera, California
Project Type:
Design / Build
year completed
2018
DESCRIPTION:
When Air Handler #2 (AH-2) at Madera Community Hospital (MCH) began to fail, New England Sheet Metal and Mechanical Co. (NESM) was called on to deliver a comprehensive engineered solution. As the prime contractor and lead design/builder, NESM provided a new air handler unit relocated to the hospital rooftop, along with installing new ducting and hydronic piping to connect the replacement AH-2 with existing systems. Thorough preplanning, scheduling, trade contractor coordination, and communication with MCH personnel, allowed for this extensive remodel to be completed with minimal downtime and interruption to hospital programing.